1. Saving the pipeline laying time: 50% at most
2. Improve the working efficiency: only one labor can finish the work
3. Mute and Moisture-proof.
4. Embedded pipeline design which can protect the pipeline from damage
5. No need staples during installation, so it can avoid damage of the insulation layer.
6. Uniform pipeline laying: keep the same distance between pipes
Size | 1320*720*37mm (L*W*H)or customized |
Grooving tube Size | Φ16mm/20mm |
Material | EPS Foam Board +HIPS |
Temperature limited | -30.C,+80.C |
Water absorption | ≤1% |
Compressive strength | ≥ 150Kpa |
Thermal conductivity | ≤ 0.030W/M.K |
Color | Blue/Yellow/Green |
Fireproof grade | B1/B2 |
Other | CFC HCFC Free; HBCD Free; ECO Friendly |
1. The ground must be flat and clear
2. Tape the boundary strip
3. Laying the EPS+HIPS Modules
4. Intall the pipes on the EPS+HIPS Modules
5. Pouring and laying the concrete to make the floor surface to be flat then install the wood floor or tile;Or Install the wood floor directly after the pipe
This is a high-efficiency energy-saving product, with ultra-low thermal conductivity, good thermal insulation performance, open the floor heating room heating fast, holding time long.
Recommended Products
Inquiry
For the purchase, use, repair and maintenance of the product, you can contact us hereSolve parts, after-sales and service related problemsgo and have a look~
Send email to Feininger customer service centermarket@feininger.cn
08:30-17:00 from Monday to Saturday